Kong Harald Retrofit

During a dry-dock period for three weeks, we replaced an old NorControl System onboard.

Old alarm and control panels in ECR desk

Old NorControl instrument panels

Old I/O Cabinet with controller and IO modules

Old modules are replaced with new S800 hardware

Old NorControl modules are replaced with redundant AC800 Controllers

New Høglund operation stations with wide screen monitors

New Høglund Control Cabinet with redundant controllers

New redundant AC800 Controllers and S800 hardware