Nordlys Retrofit
In September 2011 during a dry-dock period for three weeks, we replaced the old NordControl System onboard.
In September 2011 during a dry-dock period for three weeks, we replaced the old NordControl System onboard.
Old I/O Cabinet with controllers and I/O modules
Old alarm, computers and control panels in ECR desk
Old modules are replaced with new S800 hardware
New Høglund Control Cabinet with redundant controllers
New Høglund operation stations with wide screen monitors.
The fire on Hurtigruten’s MS NORDLYS
An engine room fire broke out on Hurtigruten’s MS NORDLYS
Damages after the fire
Damages after the fire
Damages after the fire